From first analysis to power in operation

How it works

From first analysis to power in operation

Four phases. In each one you know exactly what we do and what we need from you.

  1. 01Weeks 1 to 6

    Assessment and agreement

    What we do

    • · Analyze 12 months of bills and your load profile
    • · Visit the site and assess roof, land and electrical system
    • · Present the preliminary design and proposed rate
    • · Draft the power purchase or construction agreement

    What you do

    • · Share bills and any available drawings
    • · Coordinate site access
    • · Review and approve the proposal with your legal and finance teams
  2. 02Weeks 4 to 12

    Financing

    What we do

    • · Structure the capital with our sponsor and lenders
    • · Complete technical and insurance diligence
    • · Lock the project budget and schedule

    What you do

    • · Provide the required corporate and credit information
    • · Confirm ownership or lease of the property
  3. 03Months 3 to 9

    Construction

    What we do

    • · Process permits and interconnection
    • · Secure equipment and mobilize the crew
    • · Build to a safety plan with minimal disruption
    • · Document progress with regular reports

    What you do

    • · Designate a contact at the facility
    • · Approve work windows and access
  4. 04Month 9 onward

    Commissioning and operation

    What we do

    • · Test, energize and certify the system
    • · Monitor production in real time
    • · Provide preventive and corrective maintenance
    • · Issue your monthly energy invoice

    What you do

    • · Receive operational training
    • · Pay only for the energy produced, at the contracted rate

Phase one starts with a 30-minute conversation